Path: Top > S1-Final_Project > Fakultas_Teknik_dan_Ilmu_Komputer > Teknik_Informatika > 2011

Sistem Pendukung Keputusan Pemilihan Kontraktor Proyek Pada Lelang Dinas Cipta Karya Kabupaten Indramayu Menggunakan Metode AHP (analytic Hierarchy Process)

2011
Undergraduate Theses from JBPTUNIKOMPP / 2011-03-09 14:08:50
By : Giana; Nim 10106137, Perpustakaan UNIKOM (giana.gie@gmail.com)
Created : 2011-03-09, with 15 files

Keyword : Kontraktor, Lelang, Sistem Pendukung Keputusan, DFD, ERD, waterfall, AHP, MAUT.
Url : http://alumni.unikom.ac.id

Dinas Cipta Karya di wilayah pemerintah daerah Kabupaten Indramayu memiliki kewenangan untuk menjalankan tugas berdasarkan Peraturan Daerah (PERDA) nomor 1 tahun 2001 dan PERDA nomor 7 tahun 2001. Salah satu tugas yang dilakukan Dinas Cipta Karya adalah membangun infrastruktur dan fasilitas umum serta infrastuktur pemerintahan di wilayah pemerintah daerah Kabupaten Indramayu. Proses pemilihan kontraktor yang dilakukan Dinas Cipta Karya membutuhkan waktu yang lama. Selain itu penyajian informasi mengenai pengadaaan barang / jasa masih dilakukan secara konvensional, sehingga informasi yang kurang mengenai pengadaan barang dan jasa menyebabkan keikutsertaan para kontraktor(peserta rekanan) dalam mengikuti lelang yang diadakan oleh Dinas Cipta Karya menjadi sedikit serta kurang proporsional, maka dari itu diperlukan suatu sistem pendukung keputusan.
Pada proses pembangunan sistem pendukung keputusan untuk pemilihan kontraktor pada lelang Dinas Cipta Karya menggunakan teknik analisis data dengan metode pembangunan perangkat lunak secara waterfall. Untuk metode aliran data sistem menggunakan metode terstruktur yaitu menggunakan Data Flow Diagram (DFD) dalam menggambarkan model fungsional dan Entity Relationship Diagram (ERD) untuk menggambarkan model data.Untuk standar penilaian kriteria menggunakan metode AHP(Analytic Hierarchy Process) dan MAUT (Multi Attribute Utility Theory) dengan tahapan prakualifikasi dan pascakualifikasi.
Hasil dari penelitian ini menginformasikan data pelelangan, data ainwijiing, dan peserta lelang yang lolos pada tahap prakualifikasi dan tahap pascakualifikasi. Pengujian sistem terdiri dari pengujian Alpha dimana pengujian ini menggunakan metode pengujian Black box yang berfokus pada persyaratan fungsional perangkat lunak dan pengujian beta yaitu pengujian lapangan dengan memberikan kuesioner terhadap pengguna di Seksi Survey dan Perencanaan Teknis Bangunan Dinas Cipta Karya dengan pertanyaan yang mengacu pada tujuan akhir. Setelah dilakukan pengujian alpha dan beta, dapat ditarik kesimpulan bahwa secara fungsionalitas sistem sudah dapat menghasilkan output sesuai yang diharapkan dan user dapat meggunakannya dengan mudah.

Description Alternative :

Dinas Cipta Karya in local government areas of Indramayu district has the authority to perform duties under Regulation (Perda) No. 1 of 2001 and the Regional Regulation No. 7 of 2001. One of the tasks undertaken Dinas Cipta Karya is building the infrastructure and public facilities and infrastructure of governance in local government areas of Indramayu district. Contractor selection process conducted DGCK Office takes a long time. Besides presenting information on the procurement of goods / services are still done conventionally, so that the missing information about the procurement of goods and services led to the participation of the contractors (participants partners) in the auction held by the Office of public works has become less and less proportionally, so it is necessary a decision support system.
. In the development process of decision support system for selecting the contractor on the auction Dinas Cipta Karya using data analysis techniques with methods of software development in a waterfall. For the system data stream method use structure method that is using DFD (Data Flow Diagram) in depicting functional model and ERD (Entity Relationship Diagram) to depict the standard data.Untuk model assessment criteria using AHP (Analytic Hierarchy Process) and MAUT (Multi Attribute Utility Theory) with pre-qualification and past- qualification.
The results of this study inform the auction data, data ainwijiing, and bidders who pass the prequalification stage and post-stage. The test system consists of alpha testing where this test using black box testing method that focuses on functional requirements and software beta test is test of field by giving questionnaires to the users in the Technical Section of Survey and Planning Office Building Notices of Work with a question referring to the final destination. After alpha and beta testing, can be deduced that the functionality of the system is to produce the output as expected and the user can use it with ease.

Copyrights : Copyright � 2001 by Digital library - Perpustakaan Pusat Unikom - Knowledge Center. Verbatim copying and distribution of this entire article is permitted by author in any medium, provided this notice is preserved.

Give Comment ?#(0) | Bookmark

PropertyValue
Publisher IDJBPTUNIKOMPP
OrganizationP
Contact Namedyah@unikom.ac.id
AddressJl. Dipati Ukur No.116 Lt.7
CityBandung
RegionWest Java
CountryIndonesia
Phone022-2533825 ext.112
Fax022-2533754
Administrator E-mailperpus@unikom.ac.id
CKO E-mailperpus@unikom.ac.id